PREVIOUS PROJECTSBEFORE & AFTERS

Browse completed CCRS projects and selected repair profiles for bridges, wharves and other concrete structures.

  • REAL PROJECTS

    Completed CCRS works across multiple sectors.

  • BEFORE & AFTERS

    Clear repair outcomes and deterioration zones.

  • REPAIR PROFILES

    Example defect, scope and access scenarios.

02

Marine Wharf Pile Remediation & Protection

Sydney Harbour, NSW
PROBLEM

Chloride exposure and tidal cycling caused spalling, cracking and reinforcement corrosion across a 24-pile section of the wharf.

REPAIR

Piles were accessed from marine work platforms, deteriorated concrete removed, reinforcement remediated and structural profiles rebuilt before tidal-zone pile jackets were installed.

OUTCOME

Twenty-four reinforced-concrete piles were progressively repaired and protected, restoring damaged sections and improving durability through the tidal and splash zones.

VIEW FULL PROJECT
After repair: the same wharf section with repaired concrete pile profiles and black marine pile protection jackets secured with stainless-steel bands around the tidal zones.
Before repair: a Sydney Harbour wharf with multiple reinforced-concrete piles showing marine growth, spalling and exposed corroded reinforcement through tidal-zone repair areas.
BEFORE AFTER
PROPERTY TYPEMarine Wharf Infrastructure
PROJECT VALUE$1.18 Million
SCOPE24 RC piles • pile protection
DELIVERYMarine access • 18 weeks
03

Coastal Apartment Podium & Column Remediation

Dee Why, NSW
PROBLEM

Cracking, rust staining and spalling affected podium soffits, columns and coastal beam edges.

REPAIR

Damaged concrete was removed, reinforcement treated and structural sections rebuilt with repair mortar.

OUTCOME

Podium, column and beam sections were reinstated while safe resident access was maintained.

VIEW FULL PROJECT
After repair — Coastal Apartment Podium & Column Remediation
Before repair — Coastal Apartment Podium & Column Remediation
BEFORE AFTER
PROPERTY TYPECoastal Residential Concrete Remediation
PROJECT VALUE$748,000
SCOPEPodium, columns & beam edges
DELIVERYOccupied-property staging
04

Shopping Centre Access Ramp Remediation

Westfield Shopping Centre, Sydney, NSW
PROBLEM

Cracking, rust staining and spalling affected reinforced-concrete walls along the access ramp.

REPAIR

Walls were scanned, loose concrete removed, reinforcement treated and damaged sections rebuilt.

OUTCOME

Access-ramp walls were restored while centre operations and pedestrian access were maintained.

VIEW FULL PROJECT
After repair — Shopping Centre Access Ramp Remediation
Before repair — Shopping Centre Access Ramp Remediation
BEFORE AFTER
PROPERTY TYPECommercial Access Ramp Remediation
PROJECT VALUE$314,000
SCOPEAccess-ramp wall repairs
DELIVERYScanning + staged access
07

High-Rise Apartment Façade & Slab Edge Concrete Cancer Remediation

North Sydney, NSW
PROBLEM

Concrete cancer affected slab edges, soffits and façade projections across multiple high-rise levels.

REPAIR

Rope-access crews removed unsound concrete, treated steel and rebuilt damaged structural profiles.

OUTCOME

Façade and slab-edge sections were reinstated through staged high-rise works.

VIEW FULL PROJECT
Before repair — High-Rise Apartment Façade & Slab Edge Concrete Cancer Remediation BEFORE
PROPERTY TYPEHigh-Rise Strata Apartment Building
PROJECT VALUE$875,000
SCOPEFaçade bands, edges & soffits
DELIVERYRope-access staged works
08

Strata Basement Retaining Wall & Lift Pit Concrete Cancer Remediation

Neutral Bay, NSW
PROBLEM

Moisture exposure caused corrosion, cracking and spalling around retaining walls and the lift pit.

REPAIR

Unsound concrete was removed, reinforcement treated and wall and lift-pit sections rebuilt.

OUTCOME

Below-ground structural areas were reinstated and corrosion-related defects were addressed.

VIEW FULL PROJECT
After repair — Strata Basement Retaining Wall & Lift Pit Concrete Cancer Remediation
Before repair — Strata Basement Retaining Wall & Lift Pit Concrete Cancer Remediation
BEFORE AFTER
PROPERTY TYPEResidential Strata Complex
PROJECT VALUE$428,000
SCOPERetaining walls & lift pit
DELIVERYBelow-ground staged works
09

Apartment Concrete Awnings, Window Hoods & Façade Projection Remediation

Bondi, NSW
PROBLEM

Coastal exposure accelerated corrosion within concrete awnings, window hoods and façade projections.

REPAIR

Deteriorated concrete was removed, steel treated and original façade profiles reconstructed.

OUTCOME

Damaged façade projections were reinstated while preserving their original architectural profiles.

VIEW FULL PROJECT
After repair — Apartment Concrete Awnings, Window Hoods & Façade Projection Remediation
Before repair — Apartment Concrete Awnings, Window Hoods & Façade Projection Remediation
BEFORE AFTER
PROPERTY TYPECoastal Strata Apartment Building
PROJECT VALUE$592,000
SCOPEAwnings, hoods & projections
DELIVERYSpecialist-access remediation
10

Rooftop Parapet, Planter Box & Concrete Upstand Remediation

Randwick, NSW
PROBLEM

Water ingress around rooftop planters and parapets caused corrosion, cracking and local spalling.

REPAIR

Affected concrete was removed, steel treated and parapets, planters and upstands rebuilt.

OUTCOME

Deteriorated rooftop concrete and vulnerable repair zones were structurally reinstated.

VIEW FULL PROJECT
Before repair — Rooftop Parapet, Planter Box & Concrete Upstand Remediation BEFORE
PROPERTY TYPEMulti-Storey Strata Apartment Complex
PROJECT VALUE$367,000
SCOPEParapets, planters & upstands
DELIVERYWeather-managed rooftop works
11

Strata External Staircase, Landing & Elevated Walkway Remediation

Lane Cove, NSW
PROBLEM

Cracking, rust staining and spalling affected stair flights, landings, walkways and exposed edges.

REPAIR

Loose concrete was removed, reinforcement treated and damaged pedestrian structures rebuilt.

OUTCOME

Stair, landing and walkway sections were reinstated while access remained available.

VIEW FULL PROJECT
After repair — Strata External Staircase, Landing & Elevated Walkway Remediation
Before repair — Strata External Staircase, Landing & Elevated Walkway Remediation
BEFORE AFTER
PROPERTY TYPEResidential Strata Complex
PROJECT VALUE$514,000
SCOPEStairs, landings & walkways
DELIVERYPedestrian-managed staging
13

Major CBD Commercial Tower Façade & Structural Concrete Remediation

Sydney CBD, NSW
PROBLEM

Corrosion, cracking, delamination and spalling affected multiple tower elevations and concrete elements.

REPAIR

Concrete breakout, steel treatment, mortar repair and protective works were staged.

OUTCOME

Structural concrete was remediated across nominated tower elevations.

VIEW FULL PROJECT
Before repair — Major CBD Commercial Tower Façade & Structural Concrete Remediation BEFORE
PROPERTY TYPEHigh-Rise Commercial Tower
PROJECT VALUE$4.6 Million
SCOPEFaçade, podium & roof concrete
DELIVERYConsultant-managed major works
14

Major Marine Wharf & Terminal Concrete Cancer Remediation

Port Botany, NSW
PROBLEM

Marine exposure caused chloride-driven corrosion, cracking and widespread structural concrete spalling.

REPAIR

Damaged concrete was removed, steel treated and structural sections rebuilt and protected.

OUTCOME

Marine-exposed concrete was reinstated across wharf and terminal repair zones.

VIEW FULL PROJECT
After repair — Major Marine Wharf & Terminal Concrete Cancer Remediation
Before repair — Major Marine Wharf & Terminal Concrete Cancer Remediation
BEFORE AFTER
PROPERTY TYPEMarine / Industrial Infrastructure
PROJECT VALUE$800,000
SCOPEWharf beams, headstocks & soffits
DELIVERYOperational marine staging
15

Major Hospital Structural Concrete Crack Repair & Injection Programme

Westmead, NSW
PROBLEM

Structural cracks, active water-bearing cracks and deteriorated joints affected reinforced concrete.

REPAIR

Epoxy and polyurethane injection, joint sealing and crack stitching repaired affected areas.

OUTCOME

Structural and water-bearing cracks were remediated while critical hospital operations continued.

VIEW FULL PROJECT
PROPERTY TYPEMajor Healthcare Facility
PROJECT VALUE$700,000
SCOPEWalls, slabs & crack injection
DELIVERYLive-facility staged works
16

Westfield Underground Car Park Structural Crack Repair Programme

Westfield Shopping Centre, Sydney, NSW
PROBLEM

Slab and wall cracks, leaking joints and active water-bearing cracks affected underground car-park levels.

REPAIR

Epoxy and polyurethane injection, routing, sealing, joint repair and crack stitching were used.

OUTCOME

Crack and water-ingress repairs were completed while parking remained operational.

VIEW FULL PROJECT
Before repair — Westfield Underground Car Park Structural Crack Repair Programme BEFORE
PROPERTY TYPEMajor Retail Underground Car Park
PROJECT VALUE$1.85 Million
SCOPESlabs, walls & crack injection
DELIVERYLive car-park staging
17

Major Concrete Cancer Lintel Replacement & Remediation

Mosman, NSW
PROBLEM

Concrete cancer affected multiple lintels, causing corrosion, cracking, delamination and spalling.

REPAIR

Unsound concrete was removed, steel treated or replaced and deteriorated lintels rebuilt or replaced.

OUTCOME

Affected lintels and surrounding façade areas were systematically remediated and reinstated.

VIEW FULL PROJECT
PROPERTY TYPELarge Multi-Storey Strata Building
PROJECT VALUE$650,000
SCOPELintels & façade openings
DELIVERYStaged structural lintel works
18

32-Unit Strata Building Floor & Concrete Remediation

Hornsby, NSW
PROBLEM

Deteriorated magnesite, uneven slabs, cracking and local concrete cancer affected 32 apartments.

REPAIR

Magnesite was removed, slabs ground, concrete cancer repaired and floors levelled for new finishes.

OUTCOME

All 32 apartment floors were repaired and levelled, ready for the next refurbishment stage.

VIEW FULL PROJECT
PROPERTY TYPE32-Unit 1980s Strata Apartment Building
PROJECT VALUE$768,000
SCOPEMagnesite removal & floor levelling
DELIVERY32 Units — Staged Multi-Service Remediation
19

Westfield Parramatta Car Park Entry Beam Concrete Cancer Remediation

Parramatta, NSW
PROBLEM

Concrete cancer caused severe spalling, exposed steel and corrosion along the Westfield entry beam.

REPAIR

Unsound concrete was removed, steel treated and the beam rebuilt with structural repair mortar.

OUTCOME

The entry beam profile was restored, reinforcement encapsulated and spalling eliminated.

VIEW FULL PROJECT
After repair — Westfield Parramatta Car Park Entry Beam Concrete Cancer Remediation
Before repair — Westfield Parramatta Car Park Entry Beam Concrete Cancer Remediation
BEFORE AFTER
PROPERTY TYPEMajor Shopping Centre & Multi-Storey Car Park
PROJECT VALUE$214,000
SCOPEConcrete cancer & reinforcement repairs
DELIVERYOperational car park — staged repairs
20

Westfield Parramatta Car Park Façade, Beam & Column Remediation

Parramatta, NSW
PROBLEM

Concrete cancer affected the entry beam and column, with delamination, spalling and corroded steel.

REPAIR

Unsound concrete was removed, steel treated or replaced, then beam and column profiles rebuilt.

OUTCOME

The beam and column were reinstated to their original geometry with a uniform protected finish.

VIEW FULL PROJECT
After repair — Westfield Parramatta Car Park Façade, Beam & Column Remediation
Before repair — Westfield Parramatta Car Park Façade, Beam & Column Remediation
BEFORE AFTER
PROPERTY TYPEMajor Retail Shopping Centre Car Park
PROJECT VALUE$486,000
SCOPEBeam & column remediation
DELIVERYLive retail car park — staged remediation
21

Multi-Storey Car Park Beam & Column Structural Concrete Remediation

Sydney, NSW
PROBLEM

Severe spalling exposed corroded reinforcement at a car-park beam-to-column junction.

REPAIR

Deteriorated concrete was removed, steel treated or replaced and the junction structurally rebuilt.

OUTCOME

The beam-to-column junction was fully reinstated with reinforcement encapsulated.

VIEW FULL PROJECT
After repair — Multi-Storey Car Park Beam & Column Structural Concrete Remediation
Before repair — Multi-Storey Car Park Beam & Column Structural Concrete Remediation
BEFORE AFTER
PROPERTY TYPEMulti-Storey Reinforced Concrete Car Park
PROJECT VALUE$268,000
SCOPEBeam, column & reinforcement repairs
DELIVERYOperational car park — staged repairs
22

Strata Apartment Balcony Edge Concrete Cancer Remediation

Sydney, NSW
PROBLEM

Concrete cancer caused spalling and exposed corroded steel around an elevated balcony edge.

REPAIR

Damaged concrete was removed, steel treated or replaced and the balcony edge rebuilt with repair mortar.

OUTCOME

The balcony edge geometry was restored with reinforcement encapsulated and a clean finish.

VIEW FULL PROJECT
Before repair — Strata Apartment Balcony Edge Concrete Cancer Remediation BEFORE
PROPERTY TYPEMulti-Storey Strata Apartment Building
PROJECT VALUE$78,000
SCOPEBalcony concrete cancer repairs
DELIVERYOccupied strata — staged balcony repairs
23

Port Botany Marine Wharf Headstock

Port Botany, NSW
PROBLEM

Marine exposure caused reinforcement corrosion, cracking, delamination and spalling across the wharf headstock.

REPAIR

Unsound concrete was removed, reinforcement treated, and the headstock rebuilt with marine-grade structural repair materials.

OUTCOME

The damaged headstock section was reinstated and reinforcement re-encapsulated for continued marine service.

VIEW FULL PROJECT
Before repair — Port Botany Marine Wharf Headstock BEFORE
PROPERTY TYPEMarine Wharf Infrastructure
PROJECT VALUE$185,000
SCOPEWharf headstock concrete remediation
DELIVERYMarine-access staged works
48

Bridge Bearing Seat & Beam-End Remediation

Sydney, NSW
PROBLEM

Corrosion-related spalling has damaged the concrete cover at a road bridge beam end, exposing reinforcement near the bearing seat and its load-transfer interface.

REPAIR

Survey the support zone, protect the bearing assembly, carry out controlled breakout to approved limits, assess affected steel and reinstate the specified beam-end concrete profile.

OUTCOME

Target: reinstated concrete cover and protected reinforcement at the bearing interface, subject to curing checks and engineer-approved inspection of the support zone.

VIEW FULL PROJECT
Before repair — Bridge Bearing Seat & Beam-End Remediation BEFORE
PROPERTY TYPEConcrete road bridge
PROJECT VALUE$320k–$420k
SCOPEBearing seat & beam-end concrete
DELIVERYStaged bearing-zone access
49

Urban Road Bridge Pier & Soffit Remediation

Greater Sydney, NSW
PROBLEM

Cracking and localised spalling are visible where an urban road bridge pier meets the beam and soffit, with corrosion damage beside the active roadway.

REPAIR

Provide traffic-safe access and falling-object controls, map deterioration, break out approved defects, treat reinforcement and reinstate the pier-to-beam concrete and soffit edge.

OUTCOME

Target: sound repaired cover and a protected pier-to-beam junction, with the roadway safeguarded during the staged works and the finished repairs inspected.

VIEW FULL PROJECT
Before repair — Urban Road Bridge Pier & Soffit Remediation BEFORE
PROPERTY TYPEUrban road overpass
PROJECT VALUE$250k–$390k
SCOPEPier, beam edge & soffit
DELIVERYTraffic-safe underpass staging
50

Road Bridge Pier Concrete Cancer Repairs

Suburban road bridge
PROBLEM

A localised patch of fractured pier concrete above a roadside embankment has exposed rust-affected bars, with fine cracking at the edges of the unsound cover.

REPAIR

Inspect and map the repair area, establish road-edge barriers, remove defective concrete within approved limits, assess corroded reinforcement and restore the original pier surface.

OUTCOME

Target: reinstated concrete cover and a stable pier-face repair, completed with corrosion protection, appropriate curing and documented quality checks.

VIEW FULL PROJECT
Illustrative BEFORE concept: localised spalling and exposed corroded reinforcement to a road-bridge pier beside an embankment. BEFORE
PROPERTY TYPESuburban road bridge
PROJECT VALUE$140k–$210k
SCOPEPier face & reinforcement
DELIVERYRoadside protection & access
51

Rail Bridge Bearing Support & Beam-End Remediation

Electrified rail bridge
PROBLEM

Cover concrete has spalled at a rail bridge bearing support and beam end, leaving reinforcement exposed near the supported member and electrical rail infrastructure.

REPAIR

Plan rail possessions and safe access, protect the bearing interface, assess breakout limits and steel condition, and reinstate the designated support concrete to specification.

OUTCOME

Target: sound beam-end and bearing support cover, with engineered support clearances and documented inspections before hand-back to rail operations.

VIEW FULL PROJECT
Illustrative BEFORE concept: corrosion-related spalling and cover loss where an elevated rail-bridge beam bears onto a support pier. BEFORE
PROPERTY TYPEElevated rail viaduct
PROJECT VALUE$460k–$680k
SCOPEBearing seat & beam end
DELIVERYRail possession & isolation
52

Tidal Bridge Pier Remediation

Tidal bridge crossing
PROBLEM

Salt exposure and fluctuating tidal moisture have contributed to cracking, spalling and visible steel corrosion on a reinforced-concrete bridge pier close to the water.

REPAIR

Coordinate marine access around tides, contain debris, map defective cover, treat affected steel and reinstate the pier surface using the approved marine exposure repair system.

OUTCOME

Target: durable repaired cover concrete within the nominated tidal zone, with suitable curing, reinstatement records and inspection of the exposed pier face.

VIEW FULL PROJECT
Illustrative BEFORE concept: spalling, cracking and reinforcement corrosion in a bridge pier exposed to tidal water and salt-laden air. BEFORE
PROPERTY TYPETidal concrete bridge
PROJECT VALUE$275k–$410k
SCOPEMarine pier cover & steel
DELIVERYTide-managed repair staging
53

Marine Bridge Pier & Headstock Concrete Repairs

Coastal bridge crossing
PROBLEM

The concrete at a marine bridge pier-to-headstock junction has lost cover in several areas, with exposed reinforcement and cracking near the underside of the bridge deck.

REPAIR

Develop safe access over water, confirm the connection geometry and approved breakout limits, remediate corroded steel and reconstruct the pier and headstock repair zones.

OUTCOME

Target: an inspected and reinstated structural connection with sound concrete cover, reinforcement protection and documented checks for the marine environment.

VIEW FULL PROJECT
Illustrative BEFORE concept: extensive cover loss and partially exposed steel around the headstock-to-pier junction beneath a bridge spanning water. BEFORE
PROPERTY TYPEMarine bridge crossing
PROJECT VALUE$420k–$640k
SCOPEPier-to-headstock junction
DELIVERYSpecialist access over water
54

Under-Bridge Pier & Soffit Spalling Repairs

River bridge structure
PROBLEM

Concrete spalling and cracking occur on a bridge pier immediately below the deck, close to an adjoining beam and soffit where water staining and corroded steel are evident.

REPAIR

Protect the work area below, survey the pier and adjoining underside, remove unsound cover to approved limits, address affected steel and reinstate concrete to the required profile.

OUTCOME

Target: repaired pier cover and adjacent underside zones, with corrosion protection, curing and inspection in accordance with the structural repair specification.

VIEW FULL PROJECT
Illustrative BEFORE concept: reinforced-concrete spalling and corrosion concentrated on a pier near the beam and soffit connection. BEFORE
PROPERTY TYPERiver bridge structure
PROJECT VALUE$300k–$480k
SCOPEPier & underside soffit
DELIVERYUnder-bridge protected access
55

Bridge Soffit Edge & Reinforcement Corrosion Repairs

Road underpass
PROBLEM

A reinforced-concrete soffit edge and adjoining support zone beside an active underpass show local cracking, delamination and exposed corrosion-affected reinforcement.

REPAIR

Stage protected access beside the roadway, map defects and overhead risks, remove loose cover concrete, treat steel and rebuild the specified support and soffit-edge geometry.

OUTCOME

Target: restored concrete cover at the support edge and underside, with an inspected repair surface and traffic-safe completion of the work area.

VIEW FULL PROJECT
Illustrative BEFORE concept: cracked and spalled concrete at a bridge-support edge beside an operational road corridor, with local reinforcement exposure. BEFORE
PROPERTY TYPERoad bridge underpass
PROJECT VALUE$195k–$315k
SCOPESoffit edge & support zone
DELIVERYTraffic-adjacent work zones
56

Underwater Marine Pile Concrete Remediation & Encapsulation

Submerged wharf
PROBLEM

A submerged wharf support pile has lost substantial concrete cover, exposing corroded reinforcement beneath marine growth in a water-access-only work environment.

REPAIR

Carry out a diver-led condition assessment, prepare and reinstate the damaged concrete as specified, then secure a continuous protective pile jacket using stainless-steel bands.

OUTCOME

Target: a repaired and fully encapsulated pile zone, checked underwater for complete jacket coverage, secure banding and conformity with the approved protection system.

VIEW FULL PROJECT
Illustrative AFTER concept: marine concrete pile encapsulation jacket installed beneath a wharf by a commercial diver.
Illustrative BEFORE concept: underwater concrete cover loss with exposed corroded reinforcement and marine growth around a submerged wharf support pile.
BEFORE AFTER
PROPERTY TYPEMarine concrete wharf
PROJECT VALUE$320k–$540k
SCOPEPile repair & encapsulation
DELIVERYCommercial divers & jacketing
57

Submerged Wharf Pile Reinforcement Corrosion Repairs

Underwater wharf
PROBLEM

Underwater cracking and severe cover loss have left rusted reinforcement exposed on a wharf support pile, with marine growth and difficult visibility around neighbouring piles.

REPAIR

Inspect the damage using commercial diving access, document reinforcement condition, prepare approved repair areas and reinstate the specified concrete cover and protection system.

OUTCOME

Target: sound restored cover concrete and protected steel, supported by diver-led inspection records and quality checks for the submerged repair zone.

VIEW FULL PROJECT
Illustrative BEFORE concept: commercial diver assessing concrete spalling, partly embedded corroded reinforcement and marine growth on a submerged wharf pile. BEFORE
PROPERTY TYPESubmerged wharf piles
PROJECT VALUE$270k–$460k
SCOPEUnderwater cover & steel
DELIVERYDiver-led remedial access

How Can We Help You Today?

Choose the option that best matches your situation and get expert help from Sydney’s concrete cancer
and structural repair specialists.

I Need Someone To Inspect The
Damage

Choose this option when the concrete damage has not yet been professionally assessed or the required repair scope is unclear.

SITE INSPECTIONAssess damage on site
DIAGNOSE THE CAUSEIdentify why it is occurring
REPAIR RECOMMENDATIONClear next-step advice
Concrete Cancer Repairs Sydney specialist inspecting damaged reinforced concrete
ARRANGE AN INSPECTION

I Already Have A Report And Need
Repair Quotes

Choose this option when you already have an engineer’s report, defect report, marked-up plans or a defined tender scope.

Engineer’s ReportPDF, DWG, DOCX, JPG, PNG
Defect ReportPDF, DWG, DOCX, JPG, PNG
Marked-Up PlansPDF, DWG, DOCX, JPG, PNG
Tender ScopePDF, DWG, DOCX, JPG, PNG
Remedial SpecificationPDF, DWG, DOCX, JPG, PNG
Project PhotosPDF, DWG, DOCX, JPG, PNG