COMPLETED PROJECT 10Randwick, NSW

Rooftop Parapet, Planter Box & Concrete Upstand Remediation

Parapets, planter boxes & concrete upstands remediation delivered at Randwick, NSW.

PROJECT VALUE$367,000
SCOPEParapets, planter boxes & concrete upstands
PROPERTY TYPEMulti-Storey Strata Apartment Complex
COMPLETED09 Apr 2026

Project Overview

This Randwick, NSW project involved parapets, planter boxes & concrete upstands. Works were delivered under weather-managed rooftop works conditions, with the repair programme focused on safe access, reinforcement treatment and durable concrete reinstatement.

LOCATIONRandwick, NSW
DELIVERYWeather-managed rooftop works
REPAIR SCOPEParapets, planter boxes & concrete upstands
ACCESSRooftop exposure, moisture ingress and weather-dependent access required carefully staged works around the occupied complex.

THE PROBLEM

Long-term water ingress around rooftop planters and parapets had contributed to reinforcement corrosion, cracking, delamination and localised spalling.

THE REPAIR

Affected concrete was removed, reinforcement treated and damaged parapets, planter structures and upstands rebuilt with compatible repair mortars.

THE OUTCOME

Deteriorated rooftop concrete was restored and vulnerable repair zones reinstated as part of the roof-level remediation works.

SITE CONDITIONS

Rooftop exposure, moisture ingress and weather-dependent access required carefully staged works around the occupied complex.

A Controlled Remedial Process

Each project follows the actual repair requirements, access constraints and site conditions.

01

Inspection & Defect Mapping

Affected areas were inspected, mapped and confirmed so the repair extent could be planned before breakout.

02

Controlled Concrete Breakout

Unsound and delaminated concrete was removed back to a sound substrate while surrounding areas were protected.

03

Reinforcement Treatment

Exposed reinforcement was cleaned, assessed and treated, with replacement or augmentation completed where required.

04

Structural Reinstatement

Compatible structural repair mortar was placed and finished to reinstate the original concrete profile.

05

Protective Interfaces

Repair edges, interfaces and exposed surfaces were detailed to suit the surrounding structure and site conditions.

06

Final Inspection

Completed repair areas were checked for finish, continuity and compliance before the work zone was handed back.