Project Overview

This North Sydney, NSW project involved façade bands, slab edges, soffits & projections. Works were delivered under rope-access staged works conditions, with the repair programme focused on safe access, reinforcement treatment and durable concrete reinstatement.

LOCATIONNorth Sydney, NSW
DELIVERYRope-access staged works
REPAIR SCOPEFaçade bands, slab edges, soffits & projections
ACCESSHigh-rise rope access, overhead works and an occupied strata environment required controlled exclusion zones.

THE PROBLEM

Concrete cancer affected external slab edges, soffits and façade projections, with cracking, rust staining and localised spalling across multiple levels.

THE REPAIR

Rope-access crews removed unsound concrete, treated corroded reinforcement and rebuilt damaged profiles with structural repair mortar.

THE OUTCOME

Affected façade and slab-edge sections were reinstated as part of a staged high-rise remediation programme.

SITE CONDITIONS

High-rise rope access, overhead works and an occupied strata environment required controlled exclusion zones.

A Controlled Remedial Process

Each project follows the actual repair requirements, access constraints and site conditions.

01

Inspection & Defect Mapping

Affected areas were inspected, mapped and confirmed so the repair extent could be planned before breakout.

02

Controlled Concrete Breakout

Unsound and delaminated concrete was removed back to a sound substrate while surrounding areas were protected.

03

Reinforcement Treatment

Exposed reinforcement was cleaned, assessed and treated, with replacement or augmentation completed where required.

04

Structural Reinstatement

Compatible structural repair mortar was placed and finished to reinstate the original concrete profile.

05

Protective Interfaces

Repair edges, interfaces and exposed surfaces were detailed to suit the surrounding structure and site conditions.

06

Final Inspection

Completed repair areas were checked for finish, continuity and compliance before the work zone was handed back.