Coastal Apartment Podium & Column Remediation

Podium, columns & beam edges remediation delivered at Dee Why, NSW.

PROJECT VALUE$748,000
SCOPEPodium, columns & beam edges
PROPERTY TYPECoastal Residential Concrete Remediation
COMPLETED18 Jun 2026

Project Overview

This Dee Why, NSW project involved podium, columns & beam edges. Works were delivered under occupied-property staging conditions, with the repair programme focused on safe access, reinforcement treatment and durable concrete reinstatement.

LOCATIONDee Why, NSW
DELIVERYOccupied-property staging
REPAIR SCOPEPodium, columns & beam edges
ACCESSCoastal exposure and an occupied site required controlled access and durable repair detailing.

THE PROBLEM

Cracking, rust staining and spalling affected podium soffits, columns and beam edges in the coastal environment.

THE REPAIR

Damaged concrete was removed, reinforcement cleaned and treated, then structural sections rebuilt with repair mortar.

THE OUTCOME

Podium, column and beam sections were reinstated while safe access was maintained around the occupied property.

SITE CONDITIONS

Coastal exposure and an occupied site required controlled access and durable repair detailing.

See The Transformation

Drag the slider to compare the affected concrete with the completed remediation.

After repair — Coastal Apartment Podium & Column Remediation Before repair — Coastal Apartment Podium & Column Remediation BEFOREAFTER

A Controlled Remedial Process

Each project follows the actual repair requirements, access constraints and site conditions.

01

Inspection & Defect Mapping

Affected areas were inspected, mapped and confirmed so the repair extent could be planned before breakout.

02

Controlled Concrete Breakout

Unsound and delaminated concrete was removed back to a sound substrate while surrounding areas were protected.

03

Reinforcement Treatment

Exposed reinforcement was cleaned, assessed and treated, with replacement or augmentation completed where required.

04

Structural Reinstatement

Compatible structural repair mortar was placed and finished to reinstate the original concrete profile.

05

Protective Interfaces

Repair edges, interfaces and exposed surfaces were detailed to suit the surrounding structure and site conditions.

06

Final Inspection

Completed repair areas were checked for finish, continuity and compliance before the work zone was handed back.