COMPLETED PROJECT 16Westfield Shopping Centre, Sydney, NSW

Westfield Underground Car Park Structural Crack Repair Programme

Slabs, walls, joints & crack injection remediation delivered at Westfield Shopping Centre, Sydney, NSW.

PROJECT VALUE$1.85 Million
SCOPESlabs, walls, joints & crack injection
PROPERTY TYPEMajor Retail Underground Car Park
COMPLETED30 Jun 2026

Project Overview

This Westfield Shopping Centre, Sydney, NSW project involved slabs, walls, joints & crack injection. Works were delivered under live car-park staging conditions, with the repair programme focused on safe access, reinforcement treatment and durable concrete reinstatement.

LOCATIONWestfield Shopping Centre, Sydney, NSW
DELIVERYLive car-park staging
REPAIR SCOPESlabs, walls, joints & crack injection
ACCESSLive vehicle movements, underground access and active water ingress required staged work zones and progressive reopening.

THE PROBLEM

Static slab and wall cracks, movement-related cracking, leaking construction joints and active water-bearing cracks affected multiple underground car-park levels.

THE REPAIR

Structural epoxy and polyurethane injection systems were used alongside routing and sealing, joint remediation and localised crack stitching where required.

THE OUTCOME

A large-scale structural and water-ingress crack repair programme was completed while unaffected parking areas remained operational.

SITE CONDITIONS

Live vehicle movements, underground access and active water ingress required staged work zones and progressive reopening.

A Controlled Remedial Process

Each project follows the actual repair requirements, access constraints and site conditions.

01

Inspection & Defect Mapping

Affected areas were inspected, mapped and confirmed so the repair extent could be planned before breakout.

02

Controlled Concrete Breakout

Unsound and delaminated concrete was removed back to a sound substrate while surrounding areas were protected.

03

Reinforcement Treatment

Exposed reinforcement was cleaned, assessed and treated, with replacement or augmentation completed where required.

04

Structural Reinstatement

Compatible structural repair mortar was placed and finished to reinstate the original concrete profile.

05

Protective Interfaces

Repair edges, interfaces and exposed surfaces were detailed to suit the surrounding structure and site conditions.

06

Final Inspection

Completed repair areas were checked for finish, continuity and compliance before the work zone was handed back.