PROJECT 25 Randwick, NSW

Hospital Emergency Entry Column

Emergency entry column — Randwick, NSW.

PROJECT VALUE$118,000
SCOPEEmergency entry column
PROPERTY TYPEHealthcare Facility
COMPLETEDNovember 2025

Project Overview

This Randwick, NSW project focuses on emergency entry column. Severe spalling and exposed corroded reinforcement affected a concrete column beside the emergency entry. The damaged column cover was removed, reinforcement treated and the concrete section rebuilt with repair mortar. The emergency entry required careful separation of the repair area from patients, staff and visitors.
LOCATIONRandwick, NSW
DELIVERYControlled entry staging
REPAIR SCOPEEmergency entry column
ACCESSThe emergency entry required careful separation of the repair area from patients, staff and visitors.

THE PROBLEM

Severe spalling and exposed corroded reinforcement affected a concrete column beside the emergency entry.

THE REPAIR

The damaged column cover was removed, reinforcement treated and the concrete section rebuilt with repair mortar.

THE OUTCOME

The affected column faces were reinstated, enclosing the exposed reinforcement beneath a uniform repair finish.

SITE CONDITIONS

The emergency entry required careful separation of the repair area from patients, staff and visitors.

Before & After

After repair — Hospital Emergency Entry Column
Before repair — Hospital Emergency Entry Column
BEFORE AFTER

A Controlled Remedial Process

The repair sequence responds to the condition of the concrete, access constraints and surrounding site activity.

01

Inspection & Defect Mapping

Inspect the affected areas and establish the extent of concrete deterioration before planning access and repair zones.

02

Controlled Concrete Breakout

Remove unsound concrete back to a suitable substrate while protecting adjoining surfaces and the surrounding work area.

03

Reinforcement Treatment

Clean and assess exposed reinforcement, with any further steel repairs determined from its condition.

04

Structural Reinstatement

Place compatible repair mortar and reinstate the concrete profile to the specified repair detail.

05

Repair Finishing & Curing

Finish the repair faces and cure the material in accordance with the selected repair system.

06

Final Inspection

Check the repaired areas and remove work-zone protection when the repair and access requirements allow.

On Site Gallery