Reviewing a repair quotation with a property representative.

Have AnEngineer’s Report?

An engineering report is a useful starting point for a repair quotation. Check whether it identifies the problem, specifies the work or requires further investigation before pricing.

  • Send The Complete Report

    Include appendices, drawings and photographs.

  • Clarify The Next Step

    Distinguish recommendations from a repair specification.

  • Make Pricing Practical

    Provide access and building-use information.

Upload Your Report
By CCRS TeamRepair Reports & Quotes

Turn The FindingsInto A Clear Pricing Brief

Engineering documents serve different purposes. A condition report may identify defects and recommend further testing. A repair specification may set out materials, preparation, details and inspections. The title alone does not establish which information a contractor can rely on.

Send the complete document, including appendices and the revision date. Cropped screenshots can omit qualifications or drawings that change the scope. Identify any later advice, monitoring results or repairs completed since the inspection.

Ask the contractor to separate work that can be priced now from items needing clarification. Where a design decision is missing, it should go back to the responsible designer rather than being silently replaced by an assumption in the quote.

What To Send With The Report

Include a marked plan showing the affected locations, the building address, available access and the person authorised to arrange a visit. Explain occupation, operating hours, height restrictions and any known temporary safety measures.

Our inspection guide explains the site information that can support scoping.

Inspection of exposed reinforcement in a concrete wall.

When More InformationMay Be Needed

A quotation may remain conditional if the report recommends opening up, testing or further design. Ask for those dependencies to be identified instead of treating every recommendation as immediately priceable.

  • Unconfirmed Repair Quantities

  • Missing Repair Details

  • Restricted Or Uninspected Areas

Do not remove access restrictions just because pricing has started. Follow the professional advice already issued. The quotation process and the assessment of structural safety are separate matters.

Choose TheRight Next Step

Price A Defined Scope

If the documents sufficiently define the work, request a proposal against those documents. Ask the contractor to list any departures, exclusions and allowances clearly, including responsibility for inspections and associated reinstatement.

Investigate Before Pricing

If significant uncertainties remain, first define the additional inspection, testing or design package. A more complete brief can reduce the number of qualifications in later tenders and make comparisons more useful.

From Report To Repair Proposal

  1. Share Documents

    Provide the full current report, drawings and available photographs.

  2. Arrange Access

    Confirm a site contact and access to the nominated locations.

  3. Resolve Queries

    Send design questions to the appropriate project adviser.

  4. Compare Proposals

    Review scope, assumptions, rates and completion requirements together.

Repair plans discussed with a property representative.

Keep ControlOf The Documents

Use one current document set when obtaining several prices. If the engineer issues a revision, send it to every contractor and ask whether it changes their proposal.

  • Keep A Register

    Record document names, dates and revisions.

  • Record Answers

    Keep clarifications in writing for all tenderers.

  • Close The Gaps

    Resolve responsibility for design, inspections and handover.

Upload Your Report

What Affects The Quotation?

  • Scope Completeness

    Unresolved recommendations may require provisional allowances.

  • Quantities

    Mapped repair areas and depths support a clearer price.

  • Site Conditions

    Access, protection and occupation affect delivery.

  • Supporting Work

    Testing, temporary works and reinstatement need assigned responsibility.

A repaired concrete balcony edge and underside.

Ready To SendYour Engineer’s Report?

Upload the report through our enquiry form with your property details. We can review the proposed scope and discuss the next step towards a quotation.

  • Full Report

    Attach the document and its appendices.

  • Site Contact

    Provide the authorised contact and property address.

  • Required Timing

    Include your tender or committee decision date.